Concrete

Our Services

ADA

Lorem ipsum dolor sit

Asphalt

Lorem ipsum dolor sit

Asphalt Maintenance

Lorem ipsum dolor sit

BPP Sign Off

Lorem ipsum dolor sit

Concrete

Lorem ipsum dolor sit

Masonry

Lorem ipsum dolor sit

Street Milling

Lorem ipsum dolor sit

Striping

Lorem ipsum dolor sit

Concrete Services

  • Sidewalks
  • NYC Dot Violations
  • Driveways
  • Slabs
  • Floors
  • Concrete Loading Docks
  • Sidewalk Vaults
  • Curb Cuts (concrete and steel)

Sidewalks:

We pour commercial, industrial and residential concrete sidewalks as part of our many services. A few of our prime areas involve both large and small scale projects for airport facilities, commercial office buildings, malls, shopping centers, parking garages, parking facilities and train and subway station platforms.

NYC DOT Violations:

NYC DOT violations are official notices that are issued by the DOT notifying you that your sidewalk requires much needed repairs. Any violation may be a significant problem if you wish to sell or refinance your New York property.

Concrete Driveways:

At Galvin Contracting & Concrete we provide new driveway installations, driveway replacement and modifications and driveway resurfacing.

Concrete Slabs:

Some of the projects we’ve provided concrete slabs for are parking lots, shopping malls, commercial office buildings, promenades, subway stations, and hotels.

Concrete Floors:

Floor coating installation, self-levelling and cementitious overlay coating removal and restoration are just some of the flooring services we Galvin Contracting provide.

Concrete Loading Docks:

We have completed many Concrete Loading Dock projects over the years for many satisfied customers.

Sidewalk Vaults:

A common sidewalk vault consists of a four inch slab of sidewalk, supported by a slab of approximately four to six inches thick.

Curb Cuts (concrete and steel)

A curb cut can be a necessary aspect of an existing sidewalk, walkway or driveway. These cuts need to carried out correctly to guarantee the safety of anyone making use of the area. It may pool water or cause an unsafe area for anyone making use of the structure.

Doing the right thing,
at the right time.

15

LOCATIONS

100

ENGINEERS

47

PROJECTS

10

YEARS

1st free appointment, the fist step for your project